The traditional grouting solution in the market would partially damage the warehouse floor, making it impossible to lift the floor and level the shelves. Moreover, the warehouse would need to be closed for at least 3 months, causing a halt in operations. This means the tenants would have to vacate the shelves and goods. According to the contract, we would be required to compensate the tenants with a significant amount for the related loss expenses, which is something we are unwilling to accept. Additionally, the injected concrete slurry would add extra load to the existing deep soft soil base, posing a risk of secondary settlement in the future.
We have learned that Geobear's solution can quickly and non-invasively address the settlement issue without requiring the tenants to vacate the warehouse. Geobear can stabilize the foundation, lift the floor, and restore a high-precision level floor in the warehouse without disrupting its operations. This helps us avoid disputes with the tenants caused by settlement issues.
We are very satisfied with Geobear's work, which has met our expected results. It has successfully prevented disputes between us and the tenants. We would rate the entire project at a high score of 93!
We are concerned that delayed handling could lead to more serious consequences and a repetition of the reinstallation process. Geobear's subsidence repair technology provides us with an alternative. I sincerely recommend Geobear; they not only save you a lot of time and reduce dust, but the process is also clean and organized. Their team is efficient and professional, fixing the subsided ground in a very short time while always maintaining a clean site.
Geobear's solution for the necessary embankment repair at the M11 Girton Interchange is a highlight of this year's project plan. The innovative approach of injecting geopolymer to fill identified voids on-site represents a reformative leap forward...
Geobear's impressive solution for monitoring existing facilities, particularly addressing road surface undulations, stands out. Overall, the process and outcomes of project delivery have seen a significant improvement compared to other traditional repair methods.
The satisfactory level of logistics management and on-site construction procedures in alignment with high safety standards of the UK highways are commendable. The successful collaboration with WSP and Interserve (our respective design and construction suppliers) in achieving a successful completion has not only met but exceeded our requirements for the road system and all aspects involved.
Without the need to move any machinery, the construction project, compared to rebuilding the floor, saw a significant reduction in the construction period. Moreover, it could be carried out in segmented areas, allowing normal production and operations to continue throughout the entire construction process.
I sincerely thank the entire Geobear team; witnessing a floor lifting construction process with relatively zero accidents was a delightful surprise.
由于以下原因,我们选择了Geobear解决方案:
· 市场上的所有解决方案中需要的最短的施工时间-加固地基仅用了10天时间,而且性价比很高。
· 营业时间不干扰,这是非常重要的,要考虑到投资方只预留了非常短的时间用于施工,并且修复不需要使用重型设备,也不会干扰超市的其他维护工序。在施工期间,我们能够自由地重建其他设施。
针对地面抬升的修复方案里,传统类的其他选项在成本方面总是太高。Geobear的地质聚合物注入技术已经非常完善并且有很长的时间了,他们的丰富经验和最终效果总会使客户满意!
考虑以及对比设计师和建筑公司合作的其他地基修复方方案之后,我们决定使用Geobear。 这是因为Geobear是最具成本效益的选择,并且尽可能减少了对房屋的干扰和破坏。其他替代解决方案对房屋的破坏远远更大。
修复施工一切都进行得非常顺利,而且修复的过程中在任何时候都不会干扰该区域的常规运作。
Geobear的施工迅速而专业。地基的加固进行得很顺利,并且不影响生产。 地面的承重力也增加到了需求的承重。