Life extension of concrete roads using geopolymer resin injection treatment
This report is concerned with the eastbound section of the carriageway on the M54. An investigation reported that the unreinforced concrete slabs in lane 1 had undergone settlement and an average uplift of 10mm was required to bring the traffic running surface back to level with adjacent slabs. Geobear’s geopolymer re...